Construction · Safety & Compliance · Intermediate
Complete before the first lift of each shift. Do NOT operate the crane if any safety-critical item fails. Contact the crane coordinator immediately.
A pre-shift inspection checklist for mobile and tower cranes on construction sites. Covers structural condition, wire rope and sheaves, hook and block, safety devices (LMI, anti-two-block), controls and hydraulics, outriggers, and operator credential verification.
Crane failures cause some of the most catastrophic construction incidents. This daily inspection catches the wire rope damage, hydraulic leaks, and safety device malfunctions that develop between formal engineering inspections — before a load goes up.
This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.
Get a printable PDF version ready to use today.
Download Printable PDFTurn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.
Join hundreds of companies that trust Miratag for their quality management needs.
Start Your Free Trial