Construction · Safety & Compliance · Intermediate
Complete before the first lift of each shift. Do NOT operate the crane if any safety-critical item fails.
A pre-shift inspection checklist for mobile and tower cranes on Australian construction sites, aligned with AS 2550 and the WHS Regulations. Covers structural condition, wire rope, hooks, safety devices, controls, outriggers, and operator high-risk work licence verification.
The WHS Regulations require pre-use inspections of plant used for lifting. This daily check catches the issues that develop between formal major inspections — before a load goes up.
This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.
Get a printable PDF version ready to use today.
Download Printable PDFTurn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.
Join hundreds of companies that trust Miratag for their quality management needs.
Start Your Free Trial