Construction · Safety & Compliance · Intermediate
Complete before any worker enters the excavation. Re-inspect after rain, vibration, or any change in conditions.
A pre-work safety checklist for excavation and trenching operations on UK construction sites, aligned with HSE guidance and CDM Regulations 2015. Covers ground conditions, protective systems, underground service detection via CAT and Genny, access and egress, edge protection, and water management.
Trench collapses cause fatalities on UK sites every year. This checklist ensures every critical safety measure is verified by a competent person before anyone enters an excavation.
This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.
Get a printable PDF version ready to use today.
Download Printable PDFTurn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.
Join hundreds of companies that trust Miratag for their quality management needs.
Start Your Free Trial