Construction · Safety & Compliance · Intermediate
Step-by-step safe isolation checklist for construction site equipment and temporary installations.
Construction sites involve temporary electrical installations, pressurised systems, and plant that require safe isolation before maintenance or modification. This checklist walks through the site-specific isolation process in line with PUWER, the Electricity at Work Regulations 1989, and CDM 2015 requirements.
Unlike factory isolation, construction work often involves temporary distribution boards, multiple sub-contractors, and unfamiliar equipment. Each step requires sign-off for CDM compliance and HSE inspection readiness.
This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.
Get a printable PDF version ready to use today.
Download Printable PDFTurn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.
Join hundreds of companies that trust Miratag for their quality management needs.
Start Your Free Trial