Manufacturing Lockout/Tagout (LOTO) Checklist

Manufacturing · Safety & Compliance · Intermediate

Step-by-step lockout/tagout procedure checklist for safe equipment isolation during maintenance and servicing.

34 items 15–20 min 178 downloads Download PDF Use in App
INTL UK US

Lockout/tagout is the single most critical procedure for preventing injuries during equipment maintenance. This checklist walks authorised personnel through the complete LOTO sequence — from energy source identification and machine shutdown through isolation, lock application, stored-energy verification, and controlled restart.

Each step requires sign-off, creating a documented record that the correct procedure was followed. Use one form per lockout event to maintain a clear audit trail for safety inspections.

This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.

Download this checklist for free

Get a printable PDF version ready to use today.

Download Printable PDF

Go digital with your checklists

Turn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.

Ready to go paperless?

Join hundreds of companies that trust Miratag for their quality management needs.

Start Your Free Trial
30-day free trial
No credit card required
Cancel anytime