Manufacturing · Daily Operations · Intermediate
Complete before starting the machine for each new job or at the start of each shift. Verify tooling and parameters against the job sheet. Run a first article and verify dimensions before full production.
A per-machine start-up checklist for manufacturing operators and setup technicians to complete before beginning a production run. Covers pre-start safety inspection, lubrication and fluid checks, tooling and fixture setup, program and parameter verification, first-article inspection, and run confirmation.
A systematic start-up procedure prevents damage to expensive machinery, reduces scrap from incorrect setups, and ensures operator safety before the machine runs at speed. It's especially critical after changeovers, maintenance, or extended shutdowns.
This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.
Get a printable PDF version ready to use today.
Download Printable PDFTurn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.
Join hundreds of companies that trust Miratag for their quality management needs.
Start Your Free Trial