Cleaning · Cleaning · Intermediate
Confirm all trades have finished in each area before starting. Work top-down, inside-out. Use HEPA-filtered equipment for dust. Protect finished surfaces.
A phased cleaning checklist for commercial cleaning crews performing post-construction or post-renovation cleanup. Covers the three standard phases — rough clean (debris removal), detail clean (surfaces, fixtures, and glass), and final clean (polish and punch list preparation) — ensuring the space is handed over in move-in ready condition.
Post-construction cleaning is systematic and sequential — you can't detail-clean surfaces that are still covered in drywall dust, and you can't do the final polish while other trades are still working. This checklist ensures each phase is completed before the next begins and nothing is missed in the handover.
This checklist template is provided as a general-purpose resource and is not tailored to the regulatory requirements of any specific country, region, or jurisdiction. It is the responsibility of each organisation to review and adapt this template to ensure compliance with all applicable local laws and regulations. Miratag does not accept liability for any inaccuracies or omissions, or for any actions taken based on this template.
Get a printable PDF version ready to use today.
Download Printable PDFTurn this paper checklist into a powerful digital workflow. Track completion, ensure compliance, and get real-time insights with Miratag.
Join hundreds of companies that trust Miratag for their quality management needs.
Start Your Free Trial